Phase 2, Stage 13 Progress Report

Click on picture to enlarge it. Use the back button to get back to this page or open in a new window.Or it may open in a new window. Just close it.

Progress pictures in2001/2002

Stage 5 The length has already been cleared. BW are relining this length in conjunction with the by-pass diversion.

{short description of image} {short description of image} {short description of image} {short description of image}
Jan 2003 The new towpath wall under the bridge and the wing walls. Jan 2003: The lining of the canal is going along quite quickly. As you can see from this picture, they are using gabian walls with the bentonite liner running under them and up the back to seal the canal. February 2003 The Drayton Beauchamp work from the by-pass work to Drayton Bridge is Complete. February 2003: Drayton Farm Wharf side of the bridge.
{short description of image} {short description of image} {short description of image} {short description of image}
The wall you can see to your right is the end of the farm wharf. This is where the new sump will be to take water back into the pipeline. March 2003: The finished canal section at Drayton Beauchamp. March 2003: The finished canal section at Drayton Beauchamp. Oct 2003: The finished canal section in water at Drayton Beauchamp.