Phase 2, Stage 13 2001/2002

Stage 5 The length has already been cleared. BW are relining this length in conjunction with the by-pass diversion.

{short description of image} {short description of image} {short description of image} {short description of image}
The canal is reduced to a tricle before disapearing into the ground just before Draton bridge. September 2001: Drayton Bridge January 2002: Looking towards Drayton Bridge from the end of the Aston Clinton bypass. September 2002: Click on this pic to see the new line of the canal and the old one.
{short description of image} {short description of image} {short description of image} {short description of image}
September 2002: The new canal line up to the new Aston Clinton bypass canal bridge to wards wendover. Oct 2002: This is the canal at Drayton Beauchamp with the by-pass work in the background. BW have now stared work to extend the by-pass work. Oct 2002: The Drayton Beauchamp wock is being done by Nuttalls. they have exposed the old pipeline. The picture show the layer of asphalt which was carried out in 1855.
{short description of image} {short description of image} {short description of image} {short description of image}
The picture show the old profile of the canal . The wall of the old farm wharf can bee seen in this picture. Dec 2002: The new base of the bridge at Drayton beauchamp Dec 2002 the base is poured and the reinforcement is going in for the new towpath wall under the bridge and the wing walls.