Stage 8 (2005/2006 but by 2008 at the latest) is a
timber footbridge where a footpath crosses the bed of the dry canal at the
site of the former swing bridge No.4. The funding of this footbridge is
partly by a donation from Pat Saunders, a late work party volunteer after
whom the bridge will be named. A temporary bund may be provided at Bridge
4 to permit re-watering from bridge 4a up to this point
To see an archive of the pictures of the
work on this stage, click here
 |
 |
April 2005, This is the site of bridge no 4, the former
swingbridge. |
Oct 2005.This is the blinding for the new wingwalls for
the bridge. |
 |
 |
March 2006 the new wingwalls for the bridge. |
May 2006.The bridge is nearly finished apert from the
steps |
 |
 |
Oct 2006.The stop grove has been put in this will be
concreted in to the wing wall, |
April 2007. |
Return to Phase2