Phase 2, Stage 14 Progress Report

(26/10/02)

Click on picture to enlarge it. Use the back button to get back to this page or open in a new window.Or it may open in a new window. Just close it.

Stage 6 Aston Clinton by-pass diversion (500m)
The work on the Aston Clinton Bypass was started in October 2001.

To see an archive of the pictures of the work on this stage, click here

{short description of image} {short description of image}
February 2002: The current lay of the canal. The bypass work in the background. May 2002: The canal and towpath can be seen between the walls of the new bridge.
{short description of image} {short description of image}
April 2003: The new bridge. April 2003:Balfour beatty have beeen hard at laying more of the Bentomat lining this is from the bridge
{short description of image} {short description of image}
May 2003: Balfour beatty have now started their lining at Drayton Beauchamp and have joined their lining with the work Nuttall's did April 2003: This is where the Bentomat lining will join the wing walls at the bridge.
{short description of image}
Oct2003:The new road drainage processing section bulit in the old channel of the canal.