Stage 9 (2005/2006 but by 2007 at the latest) is a timber footbridge where a footpath crosses the bed of the dry canal. The funding of this footbridge, if required by Herts County Council (the footpath authority), is currently the subject of correspondence with HCC. A temporary bund may be provided at bridge 4a up to this point

{short description of image} {short description of image} {short description of image} {short description of image}

April 2005,This is the site of bridge no 4a,

Oct 2005.This is the blinding for the new wingwalls for the bridge April 2006. The walls and foundations of the bridge are complete. May 2006. The main structure of the bridge is up:just some steps and rails to be put up.
{short description of image}
Sep 2006.The base formwork for the wing wall at footbridges 4a