Stage 4 (2008/2009) is the fourth of six main stages of relining the dry canal bed ready for re-watering and is 350 metres long and includes a 50m reinforced concrete towpath wall to form a short term mooring

To see an archive of the pictures of the work on this stage, click here

{short description of image} {short description of image}
November 2001: The old canal bed of Phase2

Return to Phase2

Return to Index