Stage 2 (2006/2007) is the second of six main stages of relining the dry canal bed ready for re-watering and is 350 metres long and includes a 50m reinforced concrete towpath wall to form a short term mooring
![]() |
![]() |
|
| September 2001: The most overgrown bit of the canal. | March 2004 | March 2004 |