Stage 2 (2006/2007) is the second of six main stages of relining the dry canal bed ready for re-watering and is 350 metres long and includes a 50m reinforced concrete towpath wall to form a short term mooring

{short description of image} {short description of image} {short description of image}
September 2001: The most overgrown bit of the canal. March 2004 March 2004

Return to Phase2

Return to Phase2s2

Return to Index